Get Your Free Solar Site Survey
David personally reviews every solar site enquiry. We provide tailored advice for O&M managers and site operators within hours.
Critical Solar Risks
- Rodent Damage: Cable gnawing risks fires and downtime.
- Rabbit Burrowing: Soil subsidence leads to panel misalignment.
- Mole Tunnelling: Destabilises foundation pads and trenches.
- Zero Poison Policy: Protecting biodiversity and grazing livestock.
Specialist Protection
Cable & Inverter Safety
Surgical rodent monitoring and physical exclusion for critical wiring.
Ground Stability
Humane trapping to protect foundation pads and cabling trenches.
Audit-Ready O&M
Digital reporting and site maps compliant with 2026 environmental standards.
Service Areas: South & Mid Wales
Serving Ammanford, Llandeilo, the Tywi Valley, and the Brecon Beacons.